RK-2026-0394
| Property address | 14 Orchard Croft, Thornby |
| Client's name | Ms Farida Qureshi |
| Inspection date | 17 Mar 2026 |
| Surveyor | Eleanor Whitcombe |
| Membership number | 1234567 |
| Report reference | RK-2026-0394 |
Sample report
| 14 Orchard Croft, Thornby | RK-2026-0394 |
Document control
Status code: S2
| Revision | Date | Status | Description | Author | Checked | Approved |
|---|---|---|---|---|---|---|
| P01 | 20 Mar 2026 | Draft | Draft for internal check | EW | DO | |
| A | 23 Mar 2026 | Issued | First issue to client | EW | DO | DO |
Distribution
| Name | Organisation | Copies |
|---|---|---|
| Ms Farida Qureshi | Ms Farida Qureshi | 1 |
This report has been prepared for the client named on the cover and may not be relied upon by any other party without the written agreement of Report Kit 360. The issue table above records every revision; the latest row is the current issue.
| 14 Orchard Croft, Thornby | RK-2026-0394 |
Contents
| 14 Orchard Croft, Thornby | RK-2026-0394 |
A. About the inspection and report
About the inspection
| Surveyor's name | Eleanor Whitcombe | Professional membership number | 1234567 |
|---|---|---|---|
| Company name | Report Kit 360 | Date of the inspection | 17 Mar 2026 |
| Report reference number | RK-2026-0394 | Related party disclosure | None |
| Full address and postcode of the property | 14 Orchard Croft, Thornby, TB3 8MI | Weather conditions when the inspection took place | Dry and bright, 9 °C |
| Status of the property when the inspection took place | Occupied and furnished |
About the survey. This is a Level 2 (survey) report. It is a more detailed visual inspection of the inside and outside of the main building, its permanent outbuildings and the grounds. The roof space, accessible drainage chambers and the services are inspected as described in the terms of engagement. Each element is given a condition rating and, where repair is needed, a broad outline of the work, who should do it and when.
About the report. The report is written for the client named on the cover and for the purpose set out in our terms of engagement. The condition ratings are defined in the rating guide. Where an element has several parts, the worst part sets the rating and is described first. Please read the whole report, including the limitations, the issues for your legal advisers and the section headed What to do now.
| 14 Orchard Croft, Thornby | RK-2026-0394 |
| 14 Orchard Croft, Thornby | RK-2026-0394 |
B. Overall opinion and summary of condition ratings
Overall opinion
In our opinion 14 Orchard Croft is a reasonable purchase at the agreed price provided that you allow for the condition rating 3 items: the overflowing rear gutter and the removed chimney breast whose support has not been confirmed. The house is a well-built 1930s detached property that has been modernised and extended; the remaining defects are typical of its age and can be dealt with as routine maintenance over the next year or two.
Summary of condition ratings
Further investigations
Table 1 — Each entry states the element and why, when it should be done, and the kind of specialist
| Element | Why | When | Who should carry it out |
|---|---|---|---|
| D3 Rainwater goods | Overflowing gutter saturating the wall below | Now | Roofing or guttering contractor |
| E5 Chimney breast removal | Support to the retained stack not confirmed | Before exchange | Structural engineer or builder |
| F1 Electricity | No test certificate | Before exchange | Registered electrician (EICR) |
| 14 Orchard Croft, Thornby | RK-2026-0394 |
C. About the property
About the property
| Type of property | Detached house with attached garage | Approximate year built | 1932 |
|---|---|---|---|
| Approximate year extended | 2015 (single-storey rear extension) | Approximate year converted | Not converted |
| Information relevant to flats and maisonettes | Not applicable | Construction | Cavity brick walls, pitched concrete-tiled roof, timber upper floor, solid ground floor |
| Energy efficiency rating (from EPC) | D (62) | Location | Residential street of similar houses 1.5 km from the town centre |
| Facilities | Not applicable |
Table 1 — Accommodation
| Floor | Living rooms | Bedrooms | Bath / shower | Separate WC | Kitchen | Utility | Other |
|---|---|---|---|---|---|---|---|
| Lower ground | |||||||
| Ground | 2 | 0 | 0 | 1 | 1 | 1 | 1 |
| First | 0 | 3 | 1 | 0 | 0 | 0 | 0 |
| Second | |||||||
| Third | |||||||
| Other | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
| Roof spaces | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
| Total | 2 | 3 | 1 | 1 | 1 | 1 | 3 |
Main services
| Item | Result |
|---|---|
| Gas | ✔ Pass |
| Electricity | ✔ Pass |
| Mains water | ✔ Pass |
| Mains drainage | ✔ Pass |
Central heating
| Item | Result |
|---|---|
| Gas | ✔ Pass |
| Electricity | N/A |
| Solid fuel | N/A |
| Oil | N/A |
| Other / none | N/A |
The EPC describes the roof as uninsulated; we found about 250 mm of insulation in the roof space, so the rating may be slightly better than stated.
| 14 Orchard Croft, Thornby | RK-2026-0394 |
D. Outside the property
Limitations on the inspection. We inspected from ground level and from within the property using a ladder of up to three metres where it was safe to do so. We did not move heavy furniture or stored items, lift fitted carpets or floorboards, or open up any part of the structure. Where an element was covered, concealed or not reasonably accessible it is rated NI (not inspected) and the risk of hidden defects is described.
The roof was inspected from ground level with binoculars and from a ladder at the rear eaves.
| Ref | Element | Condition / description | Rating | Photo | Recommended action | Responsibility | Timescale |
|---|---|---|---|---|---|---|---|
| 1 | D2 Roof coverings | Several slipped tiles and one missing verge tile. | 2 | Refix and replace tiles | Within 12 months | ||
| 2 | D3 Rainwater pipes and gutters | Gutter sags and overflows; hopper blocked. | 3 | Clear, refix to a fall and renew brackets; check the wall below for damp once repaired | Now | ||
| 3 | D4 Main walls | Cracked render and weathered pointing at low level. | 2 | Repair render and repoint | Within 12 months | ||
| 4 | D5 Windows | Failed sealed unit (misting). | 2 | Replace the unit | Within 12 months | ||
| 5 | D1 Chimney stacks | Weathered flaunching and pointing to the rear stack. | 2 | Repoint and re-flaunch | Within 12 months |
| 14 Orchard Croft, Thornby | RK-2026-0394 |
E. Inside the property
Limitations on the inspection. We inspected from ground level and from within the property using a ladder of up to three metres where it was safe to do so. We did not move heavy furniture or stored items, lift fitted carpets or floorboards, or open up any part of the structure. Where an element was covered, concealed or not reasonably accessible it is rated NI (not inspected) and the risk of hidden defects is described.
Fitted carpets and furniture restricted the inspection of floors and walls. The roof space was viewed from the hatch.
| Ref | Element | Condition / description | Rating | Photo | Recommended action | Responsibility | Timescale |
|---|---|---|---|---|---|---|---|
| 6 | E4 Floors | Localised soft decking at the bathroom door from an old leak. | 2 | Lift and replace the affected boards | Within 12 months | ||
| 7 | E5 Fireplaces and flues | Chimney breast removed; support to the stack above not confirmed. | 3 | Open up to confirm the support or obtain building control approval; a structural engineer may be needed | Before exchange | ||
| 8 | E2 Ceilings | Historic water stain, dry at inspection. | 1 | Redecorate | Routine | ||
| 9 | E8 Bathroom fittings | Failed sealant at the bath. | 1 | Renew sealant | Routine |
| 14 Orchard Croft, Thornby | RK-2026-0394 |
F. Services
Limitations on the inspection. We inspected from ground level and from within the property using a ladder of up to three metres where it was safe to do so. We did not move heavy furniture or stored items, lift fitted carpets or floorboards, or open up any part of the structure. Where an element was covered, concealed or not reasonably accessible it is rated NI (not inspected) and the risk of hidden defects is described.
Services were not tested. The boiler was fired by the vendor.
| Ref | Element | Condition / description | Rating | Photo | Recommended action | Responsibility | Timescale |
|---|---|---|---|---|---|---|---|
| 10 | F1 Electricity | No current test certificate. | 2 | Obtain an EICR before exchange | Before exchange | ||
| 11 | F3 Water | Supply pipe may be lead. | 2 | Test and replace if lead | Within 12 months | ||
| 12 | F4 Heating | Combination boiler about eight years old; no service record. | 1 | Obtain the service record and have it serviced | Routine | ||
| 13 | F6 Drainage | Free flowing. | 1 | None |
Electrical installation — safety note. We have not tested the electrical installation. Electrical safety bodies in the UK recommend that a domestic installation is inspected and tested by a suitably registered electrician at least every ten years and on change of occupancy. Where electrical work has been carried out since 2005, ask the seller for the certificates that confirm it was completed and, where required, notified under the Building Regulations.
Gas and oil appliances — safety note. We have not tested gas or oil appliances, flues or pipework. All gas appliances and flues should be checked and serviced every year by an engineer on the Gas Safe Register; oil-fired equipment should be checked by a technician registered with a recognised competent person scheme such as OFTEC. Ask for the latest service records and safety certificates.
Services are generally hidden within the construction. We only inspected the visible parts of the available services and did not carry out specialist tests. The visual inspection cannot assess efficiency or safety; a specialist test is the only way to confirm either.
| 14 Orchard Croft, Thornby | RK-2026-0394 |
G. Grounds (including shared areas for flats)
Limitations on the inspection. We inspected from ground level and from within the property using a ladder of up to three metres where it was safe to do so. We did not move heavy furniture or stored items, lift fitted carpets or floorboards, or open up any part of the structure. Where an element was covered, concealed or not reasonably accessible it is rated NI (not inspected) and the risk of hidden defects is described.
The garden was inspected throughout; the garage was full of stored items.
| Ref | Element | Condition / description | Rating | Photo | Recommended action | Responsibility | Timescale |
|---|---|---|---|---|---|---|---|
| 14 | G1 Garage | Sound; door operates. | 1 | None | |||
| 15 | G3 Other | Leaning timber fence panels. | 2 | Replace posts and panels; confirm ownership | Within 12 months |
| 14 Orchard Croft, Thornby | RK-2026-0394 |
H. Issues for your legal advisers
The matters below should be checked by your legal adviser before you commit yourself. We have not seen the legal documents and our comments are made from the inspection and from what we were told.
H1 Regulation
Your legal adviser should confirm that building regulations approval and a completion certificate were obtained for the rear extension (approximately 2015) and that a competent-person certificate exists for the replacement windows. The property is not listed and does not lie in a conservation area as far as we are aware.
H2 Guarantees
Request copies of any guarantees for the replacement windows and doors, the boiler installation and any timber or damp treatment carried out, together with evidence that they are transferable.
H3 Other matters
Confirm the position of the boundaries, responsibility for the shared side access path and any rights of way or shared drainage serving the neighbouring property.
| 14 Orchard Croft, Thornby | RK-2026-0394 |
I. Risks
This section lists matters that may present a risk to the building, the grounds or to people, and other hazards we are aware of. identify
I1 Risks to the building
Water penetration from the overflowing rear gutter and the slipped roof tiles if the repairs listed in this report are not carried out promptly.
I2 Risks to the grounds
No significant risks to the grounds were identified.
I3 Risks to people
Electrical installation: no current test certificate; lead water pipe: the incoming supply pipe may be lead and should be tested.
I4 Other risks or hazards
Textured ceiling coatings of this age may contain asbestos; do not sand or scrape them without testing.
Asbestos and hazardous materials. Buildings constructed or refurbished before 2000 may contain asbestos. We do not sample or test materials. Where a material appears likely to contain asbestos we say so, but only laboratory analysis can confirm it. Do not disturb suspect materials; under the Control of Asbestos Regulations 2012 the person responsible for a non-domestic building must manage any asbestos present.
| 14 Orchard Croft, Thornby | RK-2026-0394 |
J. Valuation
This section is included because a valuation was instructed with the survey.
Valuation
| Market value | £415,000 (four hundred and fifteen thousand pounds) | Basis of value and assumptions | Market value as defined by RICS Valuation Standards, assuming vacant possession and the repairs listed carried out |
|---|---|---|---|
| Reinstatement cost for insurance | £342,000 | Valuation date | 17 Mar 2026 |
| Special assumptions | None |
Table 1 — Comparable evidence
| Comparable | Date | Price | Comment |
|---|---|---|---|
| 9 Orchard Croft, Thornby | 2025-11-14 | 405,000 | Similar detached house, not extended |
| 31 Lime Tree Avenue, Thornby | 2025-09-02 | 428,000 | Larger plot; refurbished |
| 4 Orchard Croft, Thornby | 2026-01-21 | 398,000 | Semi-detached; smaller garden |
| 14 Orchard Croft, Thornby | RK-2026-0394 |
Surveyor's declaration
I confirm that I inspected the property on the date stated and that this report presents my professional opinion of its condition at that time.
Prepared by Eleanor Whitcombe Report Kit 360 Date: 23 Mar 2026 |
| 14 Orchard Croft, Thornby | RK-2026-0394 |
What to do now
Getting quotations. For any item we have rated as needing repair, replacement or further investigation, obtain at least two written quotations from suitably experienced and, where appropriate, registered contractors before you commit yourself. Make sure each quotation is based on the description in this report and covers the same scope so that they can be compared.
Further investigations. Where we recommend further investigation we say which element is affected and why, when it should be done, and the kind of specialist who should carry it out. These investigations should be completed, and their findings understood, before you make a legal commitment.
Urgent items. Items rated as serious or urgent should be dealt with first. Some may affect safety, insurance or the ability to obtain a mortgage.