Snagging inspection report

Reference RK-2026-0471

Snagging inspection report
Plot 14, Meadowcroft Rise, Ashworth Green

RK-2026-0471

ClientMr and Mrs Oyelaran
SitePlot 14, Meadowcroft Rise, Ashworth Green
ReferenceRK-2026-0471
Inspection date14 Apr 2026
InspectorCallum Reidy
High: 2Medium: 2Low: 3

Sample report

Document control

Status code: S3

RevisionDateStatusDescriptionAuthorCheckedApproved
P0115 Apr 2026DraftDraft for internal checkCREW
A16 Apr 2026IssuedFirst issue to clientCREWEW

Distribution

NameOrganisationCopies
Mr and Mrs OyelaranMr and Mrs Oyelaran1

This report has been prepared for the client named on the cover and may not be relied upon by any other party without the written agreement of Report Kit 360. The issue table above records every revision; the latest row is the current issue.

1 Introduction

Report Kit 360 was instructed by Mr and Mrs Oyelaran to carry out a snagging inspection at Plot 14, Meadowcroft Rise, Ashworth Green on 14 Apr 2026. The inspection identifies incomplete, defective or damaged work visible at the time of the visit so that it can be put right before handover or the end of the defects period.

The inspection was carried out on 14 April 2026 before legal completion, accompanied by the purchasers and the site manager for Ashcombe Homes Ltd. All rooms, the garage and the garden were available. The roof space was viewed from the hatch. Services were operated but not tested. The inspection is of workmanship and finish; it is not a structural survey.

Each snag is given a priority so that the contractor can plan the work.

ColourRatingMeaning
HighMust be resolved before handover, occupation or sign-off.
MediumShould be resolved within the agreed defects period.
LowCosmetic or minor; resolve when convenient.

This report records a non-destructive visual inspection carried out from the positions, and under the conditions, described in the methodology section. No parts of the building or asset were opened up, lifted, moved or tested unless the report says so. Concealed, covered, inaccessible or obstructed areas have not been inspected and we cannot confirm that they are free from defects. Observations describe the condition on the day of inspection only.

2 Summary of snags

High: 2Medium: 2Low: 3

Area

#LocationRatingTypeSummary
1Sink waste — Below the sinkHighTrap joint leaking when the sink is emptied.
2Window reveal — Kitchen windowHighMastic missing to the external reveal, 400 mm length.
3Worktop — Joint at the hobMediumOpen joint 2 mm; unsealed.
6Patio door — Dining roomMediumDoes not lock without lifting the handle hard.
4Walls — Dining roomLowPlasterboard joint and filler visible through the paint.
5Skirting — Behind the doorLowPoor scribe with a 4 mm gap at the corner.
7Sockets — WorktopLowOne socket plate not level.

The house is finished to a reasonable standard for a volume-built property. 31 snags were recorded, of which four are high priority: a leaking waste under the kitchen sink, a cracked WC pan in the cloakroom, missing mastic to the kitchen window reveal and an external door that does not lock without force. The remainder are decorative: paint runs, filler showing through at board joints and scratches to glazing. Patterns noted were poor sealing around windows and doors and hurried final decoration.

3 Area

3.1 Kitchen and dining room

Area details

Area / roomKitchen and dining roomFloorGround
Inspected withPurchasers and site managerInspection date14 Apr 2026
RefLocationElementCondition / descriptionRatingPhotoRecommended actionResponsibilityTimescale
1Below the sinkSink wasteTrap joint leaking when the sink is emptied.High
Remake the joint and testPlumberBefore completion
2Kitchen windowWindow revealMastic missing to the external reveal, 400 mm length.High
Seal the revealWindow fitterBefore completion
3Joint at the hobWorktopOpen joint 2 mm; unsealed.MediumPull up and seal the jointKitchen fitterBefore completion
4Dining roomWallsPlasterboard joint and filler visible through the paint.LowSand, refill and repaint the wallDecoratorBefore completion
5Behind the doorSkirtingPoor scribe with a 4 mm gap at the corner.LowFill and paintJoinerBefore completion
6Dining roomPatio doorDoes not lock without lifting the handle hard.MediumAdjust the keepsWindow fitterBefore completion
7WorktopSocketsOne socket plate not level.LowRefix levelElectricianBefore completion
snagging-interior-03

Kitchen looking towards the garden

snagging-interior-04

Worktop joint at the hob

snagging-interior-05

Plasterboard joint showing through the paint

snagging-interior-01

Window reveal with mastic gap

4 Sign-off

The snags listed in this report were identified by visual inspection. Items marked as closed have been re-inspected and found to be satisfactorily completed.

Prepared by

Callum Reidy
HNC Building Studies, AssocRICS

Report Kit 360

Date: 16 Apr 2026

Signed by

Eleanor Whitcombe
BSc (Hons) MRICS

Report Kit 360

Date: 16 Apr 2026