RK-2026-0462
| Client | Pennant House Investments Ltd |
| Demised premises | Second floor, Pennant House, 18 Chandlers Row, Marlbury |
| Reference | RK-2026-0462 |
| Inspection date | 08 Apr 2026 |
| Surveyor | Eleanor Whitcombe |
| High: 2 | Medium: 6 | Low: 4 |
Sample report
| Terminal schedule of dilapidations | RK-2026-0462 |
Document control
Status code: S2
| Revision | Date | Status | Description | Author | Checked | Approved |
|---|---|---|---|---|---|---|
| P01 | 13 Apr 2026 | Draft | Draft for internal check | EW | DO | |
| A | 15 Apr 2026 | Issued | First issue to client | EW | DO | DO |
Distribution
| Name | Organisation | Copies |
|---|---|---|
| Pennant House Investments Ltd | Pennant House Investments Ltd | 1 |
This schedule has been prepared by Report Kit 360 for the client named on the cover. It may be served on, and relied upon by, the other party to the lease for the purpose of the dilapidations claim or response to which it relates, but may not be relied upon by anyone else without our written agreement. The issue table above records every revision; the latest row is the current issue.
| Terminal schedule of dilapidations | RK-2026-0462 |
Contents
| Terminal schedule of dilapidations | RK-2026-0462 |
1 Introduction
This is a terminal schedule of dilapidations for Second floor, Pennant House, 18 Chandlers Row, Marlbury, prepared on behalf of the landlord following an inspection on 08 Apr 2026. It sets out, item by item, the respects in which the premises are said not to meet the tenant's obligations under the lease, the works needed to put that right and, where costs are included, a reasonable estimate of what those works would cost.
We were instructed by Pennant House Investments Ltd on 16 March 2026 to prepare a terminal schedule of dilapidations for the second floor of Pennant House, let to Quillon Software Ltd under a lease dated 24 June 2016 for a term of ten years expiring on 23 June 2026. We were supplied with the lease, the licence for alterations dated 4 February 2019, the floor plans and the photographic schedule of condition attached to the lease.
Status of this schedule
This schedule records the surveyor's opinion of the breaches and of the works reasonably required to remedy them. It is not legal advice. Liability, the measure of loss and any statutory cap on damages are matters for the parties and their advisers, and the schedule should be read with the lease, any licences for alterations and any schedule of condition attached to the lease.
This report records a non-destructive visual inspection carried out from the positions, and under the conditions, described in the methodology section. No parts of the building or asset were opened up, lifted, moved or tested unless the report says so. Concealed, covered, inaccessible or obstructed areas have not been inspected and we cannot confirm that they are free from defects. Observations describe the condition on the day of inspection only.
| Terminal schedule of dilapidations | RK-2026-0462 |
2 Property, lease and parties
The property
| Demised premises | Second floor, Pennant House, 18 Chandlers Row, Marlbury | Type and use | Second-floor offices in a four-storey 1990s office building |
|---|---|---|---|
| Construction | Concrete frame, brick and curtain-wall cladding, raised floors, suspended ceilings | Approximate age | About 32 years (1994) |
| Floors demised | Second floor only | Extent of the demise | Internal non-structural parts, finishes and tenant's fittings; common parts excluded |
| Occupied at inspection | Yes; tenant vacating |
The lease
| Lease date | 24 June 2016 | Term | 10 years |
|---|---|---|---|
| Expiry or determination date | 23 June 2026 | Repairing covenant (clause) | Clause 4.2 |
| Decorating covenant (clause) | Clause 4.4 | Alterations and reinstatement (clause / licence) | Clause 4.9; licence for alterations dated 4 February 2019 |
| Statutory compliance (clause) | Clause 4.7 | Yielding up (clause) | Clause 4.9 |
| Schedule of condition attached | Yes; photographic schedule dated June 2016 |
The parties
| Landlord | Pennant House Investments Ltd | Tenant | Quillon Software Ltd |
|---|---|---|---|
| Guarantor | None | Landlord's surveyor | Pennant House Investments Ltd |
| Tenant's surveyor | Quillon Software Ltd | Solicitors (if known) | Penrose and Hale LLP (landlord) |
Figure 2.1 — Front elevation of the demised premises
| Terminal schedule of dilapidations | RK-2026-0462 |
3 Basis of the schedule
The premises were inspected on 8 April 2026 in the presence of the tenant's office manager. The inspection was visual; floor coverings were not lifted and the ceiling void was viewed at four sample locations. Weather was dry. Items are listed by clause of the lease; the costs are our estimate of the reasonable cost of the works at current prices, excluding VAT, preliminaries and fees, which are added in the summary.
3.1 How to read the Scott schedule
The schedules in the following sections are set out in Scott schedule form so that the other party can respond against each item. The columns read as follows: Ref is the item number; Element names the element and the lease clause or licence relied on; Condition / description states the alleged breach; Recommended action sets out the remedial works claimed; Responsibility records the party said to be liable (landlord or tenant); Cost flags items that are costed in the summary of costs; and Photo cross-refers to the photographic evidence. Where costs are included, the figure for each item appears in the summary of costs table.
| Terminal schedule of dilapidations | RK-2026-0462 |
| Terminal schedule of dilapidations | RK-2026-0462 |
Where a schedule of condition is attached to the lease, items have been compared with it and the tenant is not asked to put the premises into a better state than that recorded. Where the landlord's intentions for the premises are known they have been taken into account in deciding which works are reasonably required.
| Terminal schedule of dilapidations | RK-2026-0462 |
4 External fabric
| Ref | Element | Condition / description | Rating | Recommended action | Responsibility | Cost | Photo |
|---|---|---|---|---|---|---|---|
| 1 | Entrance door to the demise | Door closer leaking oil and door not self-closing. | Medium | Replace the closer (clause 4.2) | Tenant | £ | |
| 2 | Window blinds | Three roller blinds missing; brackets left in place. | Low | Remove brackets and make good (clause 4.9) | Tenant | £ |
| Terminal schedule of dilapidations | RK-2026-0462 |
Photograph 1 — Former meeting room partitions (external)
| # | Rating | Fault type |
|---|---|---|
| #1 | High | Alterations not reinstated |
Breach: glazed partition installed under the 2019 licence remains in place. Consequence: floor cannot be re-let as open plan. Remedy: remove and reinstate carpet and ceiling (clause 4.9). | ||
| #2 | Low | Damaged ceiling tile |
Cut ceiling tile at the partition head to be replaced. | ||
| Terminal schedule of dilapidations | RK-2026-0462 |
5 Internal area
5.1 Internal area
Area details
| Area reference | Area 2.1: open-plan office and former meeting rooms | Floor | Second |
|---|---|---|---|
| Use at inspection | Offices | Approximate area | 640 m² NIA |
| Ref | Element | Condition / description | Rating | Recommended action | Responsibility | Cost | Photo |
|---|---|---|---|---|---|---|---|
| 3 | Glazed partitions | Partitions installed under the 2019 licence not removed; carpet and ceiling grid cut around them. | High | Remove and reinstate (clause 4.9, licence) | Tenant | £ | |
| 4 | Plasterboard partitions | Holes and fixings from removed screens and shelving. | Medium | Make good and redecorate (clauses 4.2 and 4.4) | Tenant | £ | |
| 5 | Decorations | No redecoration in the last year of the term; scuffed and marked walls. | Medium | Redecorate in approved colours (clause 4.4) | Tenant | £ | |
| 6 | Suspended ceiling | 14 tiles stained or damaged. | Low | Replace tiles (clause 4.2) | Tenant | £ |
| Terminal schedule of dilapidations | RK-2026-0462 |
Photograph 2 — Plasterboard damage (internal)
| # | Rating | Fault type |
|---|---|---|
| #3 | Medium | Holes from removed fixings |
Breach: holes and plugs left by removed shelving. Remedy: fill, sand and redecorate the wall (clauses 4.2 and 4.4). | ||
| Terminal schedule of dilapidations | RK-2026-0462 |
6 Services, statutory compliance and yielding up
| Ref | Element | Condition / description | Rating | Recommended action | Responsibility | Cost | Photo |
|---|---|---|---|---|---|---|---|
| 7 | Air conditioning | No service or F-gas records supplied. | Medium | Service and supply records (clause 4.7) | Tenant | £ | |
| 8 | Emergency lighting | Test records not supplied; two fittings with failed batteries. | Medium | Replace batteries and supply records (clause 4.7) | Tenant |
Open-plan office looking east | Damaged partition at the former meeting room | Stained ceiling tiles below the AC cassette |
Entrance lobby and reception desk |
| Terminal schedule of dilapidations | RK-2026-0462 |
7 Summary of priorities
The principal breaches are the tenant's failure to remove the glazed partitions installed under the 2019 licence and to redecorate in the final year of the term. The tenant has accepted in correspondence that the partitions are to be removed. Repairs to the plasterboard and ceiling are minor. The air-conditioning records should be supplied before the lease expires.
| Terminal schedule of dilapidations | RK-2026-0462 |
8 Summary of costs
The costs below are the surveyor's estimate of the reasonable cost of carrying out the remedial works listed in the schedule, priced at the inspection date and exclusive of VAT, professional fees, loss of rent and any other consequential heads of claim unless stated. They are given to assist the parties in settling the claim and are not a quotation.
Table 8.1 — Schedule of costs (calculated total)
| Ref | Clause | Remedial works | Liability | Cost (£) |
|---|---|---|---|---|
| 1 | 4.2 | Make good holes and fixings to the partitions; repair damaged plasterboard | Tenant | £1,450 |
| 2 | 4.4 | Redecorate all previously decorated surfaces in approved colours | Tenant | £6,800 |
| 3 | 4.9 / licence 2019 | Remove the glazed meeting-room partitions and reinstate the carpet and ceiling grid | Tenant | £5,200 |
| 4 | 4.2 | Replace 14 stained and damaged suspended ceiling tiles | Tenant | £420 |
| 5 | 4.7 | Service the air-conditioning cassettes and supply the F-gas records | Tenant | £950 |
| Total | #CIRC! |
Table 8.2 — Summary of the claim
| Head of claim | Amount (£) |
|---|---|
| Remedial works (from the schedule of costs) | 14,820 |
| Preliminaries and contractor's overheads | 1,780 |
| Professional fees for supervising the works | 1,660 |
| Other heads (state) | 0 |
| Total | 18,260 |
The landlord intends to re-let the floor as open-plan offices; no supersession applies to the items listed. The claim is limited to the diminution in value of the reversion under section 18 of the Landlord and Tenant Act 1927, which we do not consider to be less than the cost of the works.
| Terminal schedule of dilapidations | RK-2026-0462 |
9 Surveyor's endorsement and signature
I confirm that I have inspected the premises, that I have read the lease and the other documents listed in this schedule, and that in my opinion the works set out in it are those reasonably required to put the premises into the condition the lease requires. In preparing the schedule I have taken into account what I know of the landlord's intentions for the premises at the end of the term. Where costs are given, I believe them to be a reasonable estimate of the cost of the works at the date of inspection.
I confirm that in my opinion the works set out in this schedule are required to put the premises into the condition required by the lease, and that the costs are a reasonable estimate of the cost of those works at the date of this schedule.
Prepared by Eleanor Whitcombe Report Kit 360 Date: 15 Apr 2026 | Checked by Daniel Okafor Report Kit 360 Date: 15 Apr 2026 |
| Terminal schedule of dilapidations | RK-2026-0462 |
Appendix A — Photographs
Photograph 3 — Stained ceiling below the AC cassette (appendix)
| # | Rating | Fault type | Tags |
|---|---|---|---|
| #4 | Low | Stained tiles | Repair |
Replace the stained tiles and confirm the cassette condensate drain has been cleared. | |||
| Terminal schedule of dilapidations | RK-2026-0462 |
Kitchenette with removed units | Holes left by removed fixings |
Open-plan office looking east | Damaged partition at the former meeting room |
| Terminal schedule of dilapidations | RK-2026-0462 |
Appendix B — Lease extracts and documents relied upon
Clause 4.2 (repair): "to keep the premises in good and substantial repair and condition". Clause 4.4 (decoration): "to redecorate in the last year of the term in colours first approved by the landlord". Clause 4.9 (yielding up): "to yield up the premises with vacant possession, repaired and decorated in accordance with the tenant's covenants and with all alterations removed and the premises reinstated". Copies of the lease and the licence for alterations dated 2019 are held on file.
Stained ceiling tiles below the AC cassette | Entrance lobby and reception desk |
Kitchenette with removed units | Holes left by removed fixings |